The driveway to plot 51 all shaped up ready for the tarmac binder course to be laid. Excavation for the foundations of plots 5 through to 11 prior to concreting. Blockwork complete on plots 15  17 ready to receive internal drainage. Works are now commencing on laying the slabs to the patios and footpaths to the rear of plots 5 through to 11.
Groundworks / Roads & Sewers ...
Wain Homes, Leek Road, Cheddleton, Stoke on Trent.

Newpools work was to construct 173 units of varying types from apartments through to 5 bedroom detached houses.

The foundations on this development where piled with ring beam, and block and beam floors.
Plot 173 Gangerman Adrian Sumner fiting ring beam prior to beam form being installed.
 
Plot 173 all ring beam is now complete and form has been fitted.
 
Gangerman Adrian Sumner and Andrew Marriot start to install concrete to the ring beam on plot 173
 
Plot 173 after block and beam floor has been installed.
 
Frontage of plot 51. Pat Raymar hard at work laying slabs to front door to enable Part-M access.
 
The driveway to plot 51 all shaped up ready for the tarmac binder course to be laid.
    
Latest NEWS... Latest NEWS...
Vacancies
Site Engineer required for immediate start, must have Civil Engineering/Groundworks experience.

Site Engineer for immediate start, to work on contracts within the midlands,must have Civil Engineering/Groundworks experience.
All applicants please forward your CV to info@newpoolconstruction.co.uk F.A.O R O'Connor / R.MacKenzie.
Newpool Construction are proud members of 
Newpool Construction Limited, The Uplands, Wolverhampton Road, Shifnal, Shropshire, TF11 9HA
©  - Newpool Construction Ltd. privacy policy terms & conditions of use website by Linxdesign Internet Ltd.